Collection: Sewer Pipe & Fittings

Shop by size and type

Plastic or clay sewer pipe?

Plastic (uPVC) is now the usual choice for house drains and light commercial work. It is light, quick to cut and lay, smooth inside so waste flows well, and flexible enough to take some ground movement without cracking. Clay is still laid. It is inert and strong, but it is heavy, harder to cut and costs more, and is more prone to root intrusion and cracking. A clay drain that still works without leaking doesn't need replacing: join new plastic pipe to it with an adapter coupling. For clay pipe, see clay sewer pipes.

Junction or saddle?

Both join a branch drain into an existing main pipe. A saddle needs less digging and labour, especially on larger pipes. A junction is the traditional, in-line method.

  • Junction: dig out around the whole pipe, cut out a section and fit the junction in its place. More digging and labour, and large junctions may need lifting gear.
  • Saddle: dig down to the top of the pipe only, core a hole and fit the saddle over it to make a sealed joint. Less digging and no lifting, which often saves time on larger pipes.

Tell us the size and material of the main pipe and we can advise which suits.

Gully traps

A gully trap is a ground-level gully that holds water in a U-bend. That water seal stops sewer smells coming back up, and the gully catches leaves and grit before they reach the drain. Gullies usually sit at the foot of a downpipe or by an outside sink or waste pipe.

  • P-trap gully: a U-shaped trap that holds the water seal
  • Bottle gully: a compact trapped gully; some have an inner pot that lifts out for cleaning
  • Back inlet gully: takes a pipe in from behind, which suits some layouts

How to install a gully trap

  1. Place the gully where the water collects, usually under the downpipe or waste.
  2. Dig a hole wide and deep enough for the gully and a firm base.
  3. Lay and compact a bed of gravel or hardcore, and set the gully on it, level.
  4. Connect the inlets, then run the outlet pipe to the drain at a steady fall. Make the joints as the maker's instructions say.
  5. Backfill and compact around the gully, with the top flush with the finished surface.
  6. Pour water in to check it flows away and nothing leaks.

Questions about sewer pipe & fittings

Should I use 110mm or 160mm sewer pipe?

Use 110mm for a single house and for branch drains. Use 160mm where several properties share one drain or on long runs that need a flatter fall. A 160mm to 110mm level invert reducer joins the two sizes.

What standard does sewer pipe meet?

Orange-brown uPVC underground drainage pipe and fittings are made to BS EN 1401. Pipe and fittings made to it fit other BS EN 1401 systems of the same size.

What is the difference between sewer pipe and soil pipe?

Sewer pipe is the orange-brown pipe that goes underground. Soil pipe is the grey, black or white pipe that runs above ground on or inside the building. They use different standards and are not interchangeable without an adaptor.

What fall should sewer pipe be laid at?

Lay it to a steady, even fall towards the outfall. Too little fall lets solids settle and block the pipe. Approved Document H gives the minimum falls for each pipe size and flow, so check the current figures or ask Building Control. That applies in England; Wales, Scotland and Northern Ireland have their own rules.

How do I keep a gully trap clear?

Lift the grid and clear out leaves, silt and debris regularly. Check the seals and joints are still watertight. Now and then, flush the gully through with clean water to keep it running freely. Pricing up a full drainage run? Send your plans for a free drawing take-off.