
Alternative sizes
The same item in other sizes. Each opens its own page and price.
Goes well with this
Tick what you need and add it all to the basket in one go.
Overview
The 9 Person BioAir 3 Sewage Treatment Plant by Clearwater (CW3) offers exceptional wastewater treatment performance for domestic properties such as homes, small offices, and farms. Using advanced aeration technology, it ensures efficient treatment and high-quality effluent discharge.
This tank is lightweight, robust, and easy to install. Once in place, it has a low visual impact, making it ideal for discreet installation in landscaped areas or residential settings.
Key Features:
- Easy to install
- Lightweight, durable construction
- Advanced aeration technology
- Low visual impact after installation
- Reliable, long-lasting performance
1 Year Warranty*
FREE UK DELIVERY
*T’s & C’s apply
More product information
This 9 person BioAir sewage treatment plant by Clearwater offers exceptional performance by using superior aeration technology. It provides a cost-effective solution to the processing of wastewater for a variety of applications. These include single and multiple homes, small offices, farms and barn conversions. Once installed, this tank has minimal visual impact, leaving it a discreet yet effective product.
How does it work?
Investing in this BioAir 3 sewage treatment plant will allow you to remove contaminants from sewage and ensure that effluent water is removed effectively and efficiently. Clearwater BioAir sewage systems offer a modern alternative to other methods of sewage treatment.
There are 3 stages to the treatment process; aeration, settling phase and clear water extraction. The wastewater enters the tank and is filtered using high-performance aeration technology. The sludge then settles at the bottom of the tank, and the remaining clear water is extracted and drained in a soakaway or other drainage method
Est Delivery. 5 – 8 working days
Specification
| Product code | STP9BIOA3G-C |
|---|---|
| Brand | Clearwater |
| Daily flow | 1.35m3/d |
| Depth | 2480mm |
| Height | 2375mm |
| Inlet invert | 575-875mm |
| Material | MDPE |
| Serves | 9 people |
| Weight | 200kg |
| Width | 1690mm |
Downloads
Delivery and collection
- Delivered across Great Britain on our own vehicles or by courier, depending on the product.
- Delivery is charged per delivery, not per item, by zone.
- Collect from Cotterills Birmingham Depot, near Junction 9 of the M42: Hermitage Farm, Grove Lane, Wishaw, B76 9QJ.
- Northern Ireland, the islands, the Isle of Man and the Channel Islands are quoted separately.
Questions about 7-12 person sewage treatment plants
How much is delivery?
Delivery is priced by zone and charged per delivery, not per item. Enter your postcode above to see the price for your site, or see our delivery zones page.
Can I collect my order?
Yes. You can collect from Cotterills Birmingham Depot, near Junction 9 of the M42 (Hermitage Farm, Grove Lane, Wishaw, B76 9QJ), Monday to Friday. Choose collection at checkout.
Can I open a trade account?
Yes. Groundworkers, contractors and merchants can apply for a credit account online. Apply for a trade account.
Can you price a whole job from drawings?
Yes. Send us your site drawings and we'll do a free take-off and quote the full drainage schedule, with no obligation. Send your drawings.
Still unsure? Call 0121 351 3230 and talk to the team.
Reviews
What our trade customers say
Reviews are collected independently by REVIEWS.io from verified customers.
Buying for your business?
Open a trade account to buy on credit, with quotes for large and mixed orders.
- Credit account for regular orders
- Free drawing take-off and full quotes
- Delivery to site across Great Britain
Got drawings? We'll price the whole job
Send your site drawings and we'll do a free take-off and quote the full drainage schedule, with no obligation.