Unique lifting design: The certified integral lifting ring on our chambers makes installation and maintenance easier than ever
Our new range of chambers can be lifted entirely into an excavation. This unique design includes an integral lifting ring with incorporated slinging points. The lifting ring is designed to remain attached to the chamber so installation is less labour intensive, faster and more cost-effective than other chamber designs. Available in 1.2m diameter as well as other sizes on request, the chambers are designed to optimise ease of access for future maintenance of the drainage system.
They’re fabricated to order in our factory, from galvanised steel and delivered to site ready to install. An easy-to-follow WRc accredited installation guide helps save even more time and resource. The chamber design was developed by Tubosider’s design team to meet market demand, after talking to customers and recognising some of the everyday challenges that access chambers and manhole present.
Easy to install
WRc approved installation instructions.
Unique design
Secure integral lifting ring with incorporated slinging points
Low cost
Reduces cost and time burden of inspection and maintenance.
Made to order
Fully fabricated and delivered ready to install.
Questions & Enquiries
Fill in the form below and a friendly member of our team will be in touch with you shortly, alternatively, you can use our live chat service or call us now on 0121 351 3230.
We’re not your typical merchant. Core to everything we do is our customers. After all, without you, we wouldn’t be here. At Cotterill Civils, we offer something a little different and we show this in the values we adhere to every day! Why not get in touch today to see how we can help you!